Morozenko Andrey Aleksandrovich -
Moscow State University of Civil Engineering (National Research University) (MGSU)
Doctor of Technical Sciences, Professor, Department of Thermal and Nuclear Power Objects Construction, Moscow State University of Civil Engineering (National Research University) (MGSU), 26 Yaroslavskoe shosse, Moscow, 129337, Russian Federation;
This e-mail address is being protected from spambots. You need JavaScript enabled to view it
.
-
Krasovskiy Dmitriy Viktorovich -
Moscow State University of Civil Engineering (National Research University) (MGSU)
postgraduate student, Department of Thermal and Nuclear Power Objects Construction, Moscow State University of Civil Engineering (National Research University) (MGSU), 26 Yaroslavskoe shosse, Moscow, 129337, Russian Federation;
This e-mail address is being protected from spambots. You need JavaScript enabled to view it
.
The article considers the current problematic issues in the management of investment-construction projects, examines the questions of efficiency increase of construction operations on the basis of the formation of a reflex-adaptive organizational structure. The authors analyzed the necessity of forming a matrix of key events in the investment-construction project (ICP), which will create the optimal structure of the project, basing on the work program for its implementation. For convenience of representing programs of the project implementation in time the authors make recommendations to consolidate the works into separate, economically independent functional blocks. It is proposed to use an algorithm of forming the matrix of an investment-construction project, considering the economic independence of the functional blocks and stages of the ICP implementation. The use of extended network model is justified, which is supplemented by organizational and structural constraints at different stages of the project, highlighting key events fundamentally influencing the further course of the ICP implementation.
DOI: 10.22227/1997-0935.2016.11.105-113
-
Morozenko Andrey Aleksandrovich -
Moscow State University of Civil Engineering (National Research University) (MGSU)
Doсtor of Technical Sciences, Head of the Thermal and Nuclear Power Objects Construction Department, Moscow State University of Civil Engineering (National Research University) (MGSU), 26 Yaroslavskoe shosse, Moscow, 129337, Russian Federation.
-
Krasovskiy Dmitriy Viktorovich -
Moscow State University of Civil Engineering (National Research University) (MGSU)
Postgraduate Student, Thermal and Nuclear Power Objects Construction Department, Moscow State University of Civil Engineering (National Research University) (MGSU), 26 Yaroslavskoe shosse, Moscow, 129337, Russian Federation.
The article discusses the current disadvantages of the scheduling-network planning in the management of the terms of investment-construction project. Problems associated with the construction of the schedule and the definitions of the duration of the construction project are being studied. The problems of project management for the management apparatus are shown, which consists in the absence of mechanisms for prompt response to deviations in the parameters of the scheduling-network diagram. A new approach to planning the implementation of an investment-construction project based on a matrix of key events and a rejection of the current practice of determining the duration based on inauthentic regulatory data. An algorithm for determining the key events of the project is presented. For increase the reliability of the organizational structure, the load factor of the functional block in the process of achieving the key event is proposed. Recommendations for improving the interaction of the participants in the investment-construction project are given.
DOI: 10.22227/1997-0935.2017.6.674-679