Error
  • Error loading Modules:Can't create/write to file '/var/lib/mysql/tmp/#sql_bd4_0.MYI' (Errcode: 30) SQL=SELECT id, title, module, position, content, showtitle, control, params FROM jos_modules AS m LEFT JOIN jos_modules_menu AS mm ON mm.moduleid = m.id WHERE m.published = 1 AND m.access <= 0 AND m.client_id = 0 AND ( mm.menuid = 8 OR mm.menuid = 0 ) ORDER BY position, ordering
  • Error loading Modules:Can't create/write to file '/var/lib/mysql/tmp/#sql_bd4_0.MYI' (Errcode: 30) SQL=SELECT id, title, module, position, content, showtitle, control, params FROM jos_modules AS m LEFT JOIN jos_modules_menu AS mm ON mm.moduleid = m.id WHERE m.published = 1 AND m.access <= 0 AND m.client_id = 0 AND ( mm.menuid = 8 OR mm.menuid = 0 ) ORDER BY position, ordering
  • Error loading Modules:Can't create/write to file '/var/lib/mysql/tmp/#sql_bd4_0.MYI' (Errcode: 30) SQL=SELECT id, title, module, position, content, showtitle, control, params FROM jos_modules AS m LEFT JOIN jos_modules_menu AS mm ON mm.moduleid = m.id WHERE m.published = 1 AND m.access <= 0 AND m.client_id = 0 AND ( mm.menuid = 8 OR mm.menuid = 0 ) ORDER BY position, ordering
  • Error loading Modules:Can't create/write to file '/var/lib/mysql/tmp/#sql_bd4_0.MYI' (Errcode: 30) SQL=SELECT id, title, module, position, content, showtitle, control, params FROM jos_modules AS m LEFT JOIN jos_modules_menu AS mm ON mm.moduleid = m.id WHERE m.published = 1 AND m.access <= 0 AND m.client_id = 0 AND ( mm.menuid = 8 OR mm.menuid = 0 ) ORDER BY position, ordering
  • Error loading Modules:Can't create/write to file '/var/lib/mysql/tmp/#sql_bd4_0.MYI' (Errcode: 30) SQL=SELECT id, title, module, position, content, showtitle, control, params FROM jos_modules AS m LEFT JOIN jos_modules_menu AS mm ON mm.moduleid = m.id WHERE m.published = 1 AND m.access <= 0 AND m.client_id = 0 AND ( mm.menuid = 8 OR mm.menuid = 0 ) ORDER BY position, ordering
  • Error loading Modules:Can't create/write to file '/var/lib/mysql/tmp/#sql_bd4_0.MYI' (Errcode: 30) SQL=SELECT id, title, module, position, content, showtitle, control, params FROM jos_modules AS m LEFT JOIN jos_modules_menu AS mm ON mm.moduleid = m.id WHERE m.published = 1 AND m.access <= 0 AND m.client_id = 0 AND ( mm.menuid = 8 OR mm.menuid = 0 ) ORDER BY position, ordering
  • Error loading Modules:Can't create/write to file '/var/lib/mysql/tmp/#sql_bd4_0.MYI' (Errcode: 30) SQL=SELECT id, title, module, position, content, showtitle, control, params FROM jos_modules AS m LEFT JOIN jos_modules_menu AS mm ON mm.moduleid = m.id WHERE m.published = 1 AND m.access <= 0 AND m.client_id = 0 AND ( mm.menuid = 8 OR mm.menuid = 0 ) ORDER BY position, ordering
  • Error loading Modules:Can't create/write to file '/var/lib/mysql/tmp/#sql_bd4_0.MYI' (Errcode: 30) SQL=SELECT id, title, module, position, content, showtitle, control, params FROM jos_modules AS m LEFT JOIN jos_modules_menu AS mm ON mm.moduleid = m.id WHERE m.published = 1 AND m.access <= 0 AND m.client_id = 0 AND ( mm.menuid = 8 OR mm.menuid = 0 ) ORDER BY position, ordering
  • Error loading Modules:Can't create/write to file '/var/lib/mysql/tmp/#sql_bd4_0.MYI' (Errcode: 30) SQL=SELECT id, title, module, position, content, showtitle, control, params FROM jos_modules AS m LEFT JOIN jos_modules_menu AS mm ON mm.moduleid = m.id WHERE m.published = 1 AND m.access <= 0 AND m.client_id = 0 AND ( mm.menuid = 8 OR mm.menuid = 0 ) ORDER BY position, ordering
  • Error loading Modules:Can't create/write to file '/var/lib/mysql/tmp/#sql_bd4_0.MYI' (Errcode: 30) SQL=SELECT id, title, module, position, content, showtitle, control, params FROM jos_modules AS m LEFT JOIN jos_modules_menu AS mm ON mm.moduleid = m.id WHERE m.published = 1 AND m.access <= 0 AND m.client_id = 0 AND ( mm.menuid = 8 OR mm.menuid = 0 ) ORDER BY position, ordering
  • Error loading Modules:Can't create/write to file '/var/lib/mysql/tmp/#sql_bd4_0.MYI' (Errcode: 30) SQL=SELECT id, title, module, position, content, showtitle, control, params FROM jos_modules AS m LEFT JOIN jos_modules_menu AS mm ON mm.moduleid = m.id WHERE m.published = 1 AND m.access <= 0 AND m.client_id = 0 AND ( mm.menuid = 8 OR mm.menuid = 0 ) ORDER BY position, ordering
  • Error loading Modules:Can't create/write to file '/var/lib/mysql/tmp/#sql_bd4_0.MYI' (Errcode: 30) SQL=SELECT id, title, module, position, content, showtitle, control, params FROM jos_modules AS m LEFT JOIN jos_modules_menu AS mm ON mm.moduleid = m.id WHERE m.published = 1 AND m.access <= 0 AND m.client_id = 0 AND ( mm.menuid = 8 OR mm.menuid = 0 ) ORDER BY position, ordering
  • Error loading Modules:Can't create/write to file '/var/lib/mysql/tmp/#sql_bd4_0.MYI' (Errcode: 30) SQL=SELECT id, title, module, position, content, showtitle, control, params FROM jos_modules AS m LEFT JOIN jos_modules_menu AS mm ON mm.moduleid = m.id WHERE m.published = 1 AND m.access <= 0 AND m.client_id = 0 AND ( mm.menuid = 8 OR mm.menuid = 0 ) ORDER BY position, ordering
  • Error loading Modules:Can't create/write to file '/var/lib/mysql/tmp/#sql_bd4_0.MYI' (Errcode: 30) SQL=SELECT id, title, module, position, content, showtitle, control, params FROM jos_modules AS m LEFT JOIN jos_modules_menu AS mm ON mm.moduleid = m.id WHERE m.published = 1 AND m.access <= 0 AND m.client_id = 0 AND ( mm.menuid = 8 OR mm.menuid = 0 ) ORDER BY position, ordering
  • Error loading Modules:Can't create/write to file '/var/lib/mysql/tmp/#sql_bd4_0.MYI' (Errcode: 30) SQL=SELECT id, title, module, position, content, showtitle, control, params FROM jos_modules AS m LEFT JOIN jos_modules_menu AS mm ON mm.moduleid = m.id WHERE m.published = 1 AND m.access <= 0 AND m.client_id = 0 AND ( mm.menuid = 8 OR mm.menuid = 0 ) ORDER BY position, ordering
  • Error loading Modules:Can't create/write to file '/var/lib/mysql/tmp/#sql_bd4_0.MYI' (Errcode: 30) SQL=SELECT id, title, module, position, content, showtitle, control, params FROM jos_modules AS m LEFT JOIN jos_modules_menu AS mm ON mm.moduleid = m.id WHERE m.published = 1 AND m.access <= 0 AND m.client_id = 0 AND ( mm.menuid = 8 OR mm.menuid = 0 ) ORDER BY position, ordering
  • Error loading Modules:Can't create/write to file '/var/lib/mysql/tmp/#sql_bd4_0.MYI' (Errcode: 30) SQL=SELECT id, title, module, position, content, showtitle, control, params FROM jos_modules AS m LEFT JOIN jos_modules_menu AS mm ON mm.moduleid = m.id WHERE m.published = 1 AND m.access <= 0 AND m.client_id = 0 AND ( mm.menuid = 8 OR mm.menuid = 0 ) ORDER BY position, ordering

ECONOMICS, MANAGEMENT AND ORGANIZATION OF CONSTRUCTION PROCESSES

Analysis and estimation of risk management methods

Vestnik MGSU 5/2016
  • Kankhva Vadim Sergeevich - Moscow State University of Civil Engineering (National Research University) (MGSU) Candidate of Economical Sciences, Associate Professor, Department of Economy and Management in the Construction, Moscow State University of Civil Engineering (National Research University) (MGSU), 26 Yaroslavskoye Shosse, Moscow, 129337, Russian Federation; This e-mail address is being protected from spambots. You need JavaScript enabled to view it .
  • Efremyan Boris Levonovich - Moscow State University of Civil Engineering (National Research University) (MGSU) postgraduate student, Department of Economy and Management in the Construction, Moscow State University of Civil Engineering (National Research University) (MGSU), 26 Yaroslavskoye Shosse, Moscow, 129337, Russian Federation; This e-mail address is being protected from spambots. You need JavaScript enabled to view it .

Pages 107-118

At the present time risk management is an integral part of state policy in all the countries with developed market economy. Companies dealing with consulting services and implementation of the risk management systems carve out a niche. Unfortunately, conscious preventive risk management in Russia is still far from the level of standardized process of a construction company activity, which often leads to scandals and disapproval in case of unprofessional implementation of projects. The authors present the results of the investigation of the modern understanding of the existing methodology classification and offer the authorial concept of classification matrix of risk management methods. Creation of the developed matrix is based on the analysis of the method in the context of incoming and outgoing transformed information, which may include different elements of risk control stages. So the offered approach allows analyzing the possibilities of each method.

DOI: 10.22227/1997-0935.2016.5.107-118

References
  1. Khokhlov N.V. Upravlenie riskom [Risk Management]. Moscow, YuNITI Publ., 1999, 239 p. (In Russian)
  2. Dmitriev M.V., Koshechkin S.A. Kolichestvennyy analiz riska investitsionnykh proektov [Qualitative Risk Analysis of Investment Projects]. Korporativnyy menedzhment [Corporate Management]. Available at: http://www.cfin.ru/finanalysis/quant_risk.shtml. (In Russian)
  3. Moskvin V.A. Upravlenie riskami pri realizatsii investitsionnykh proektov [Risk Management in the Implementation of Investment Projects]. Moscow, Finansy i statistika Publ., 2004, 350 p. (In Russian)
  4. Girmscheild G. Projektabwicklungin der Bauwirstchaft — Wege zur Win-Win-Situaition für Auftragsnehmer. Berlin, Springer, 2004, 450 p. DOI: http://dx.doi.org/10.1007/978-3-540-72555-8.
  5. Schnorrenberg U., Goebels G. Risikomanagement in Projekten. Braunschweig, Vieweg, 1999.
  6. Willians T.M. Risk-Management Infrastructures. International Journal of Project Management. 1993, vol. 11(1), pp. 5—10. DOI: http://dx.doi.org/10.1016/0263-7863(93)90003-6.
  7. Lankina S.A. Upravlenie ekonomicheskimi riskami na raznykh stadiyakh investitsionnogo tsikla v stroitel’nom komplekse: dissertatsiya … kandidata ekonomicheskikh nauk [Economical Risk Management on Different Stages of Investment Cycle in the Construction Complex : dissertation of the Candidate of Economical Sciences]. Moscow, 2005, 164 p. (In Russian)
  8. Goncharenko L.P., Filin S.A. Risk-menedzhment [Risk Management]. 3rd edition. Moscow, KnoRus Publ., 2008, 215 p. (In Russian)
  9. Kropotina O.E. Razvitie sistemy upravleniya riskami promyshlennykh predpriyatiy s uchetom ikh otsenki i strakhovaniya: dissertatsiya … kandidata ekonomicheskikh nauk [Development of Risk Management of Industrial Enterprises with Account for Their Estimation and Insurance dissertation of the Candidate of Economical Sciences]. Moscow, 2010, 164 p. (In Russian)
  10. Tsay T.N. Konkurentsiya i upravlenie riskami na predpriyatiyakh v usloviyakh rynka [Competition and Risk Management on Enterprises in Market Conditions]. Moscow, Alans Publ., 1997, 288 p. (In Russian)
  11. Ermasova N.B. Risk-menedzhment organizatsii [Risk Management in a Company]. Moscow, Dashkov i K Publ., 2014, 380 p. (In Russian)
  12. Dorokhina, E.Yu. Metodologiya upravleniya riskami proektno-orientirovannogo predpriyatiya : na primere predpriyatiya stroitel’noy otrosli : dissertatsiya … doktora ekonomicheskikh nauk [Risk Management Methodology of a Project-Oriented Enterprise : on the Example of a Construction Enterprise : dissertation of the Doctor of Economical Sciences]. Saint Petersburg, 2011, 348 p. (In Russian)
  13. Fedos’ina A.V. Metody snizheniya riskov innovatsionnykh protsessov [Risk Mitigation Methods of Innovative Processes]. Aktual’nye problemy menedzhmenta predpriyatiy investitsionno-stroitel’noy sfery: sbornik trudov [Current Problems of Management of the Enterprises of Investment and Construction Sphere : Collection of Works]. Moscow, MGSU, 2010, no. 4, pp. 103—111. (In Russian)
  14. Ivanov N.A., Ivanova M.A. Semanticheskaya set’ kak sposob predstavleniya zapisey o nesootvetstviyakh v sistemakh upravleniya kachestvom [Semantic Net as a Method of Presenting Entries for Nonconformities in Quality Management Systems]. Ekonomika i predprinimatel’stvo [Economy and Entrepreneurship]. 2014, no. 9 (50), pp. 821—823. (In Russian)
  15. Kankhva V.S., Neretin M.V. Klassifikatsiya riskov organizatsiy stroitel’noy otrasli i metody ikh snizheniya [Classification of Risks of Construction Enterprises and Methods of Their Reduction]. Ekonomika i upravlenie narodnym khozyaystvom [Economy and Management of the National Economy]. 2014, no. 1—2, pp. 64—67. (In Russian)
  16. Kankhva V.S., Efremyan B.L. Klassifikatsiya riskov po urovnyam operatsionnogo upravleniya [Risk Classification According to Levels of Operational Management]. Nauchnoe obozrenie [Scientific Review]. 2015, no. 12, pp. 295—298. (In Russian)
  17. Panteleeva M.S., Gorobnyak A.A., Borozdina S.M. Otsenka effektivnosti funktsionirovaniya organizatsionnoy struktury marketinga dlya stroitel’nogo predpriyatiya [Efficiency Estimation of Marketing Structure Organization for a Construction Enterprise]. Ekonomika i predprinimatel’stvo [Economy and Entrepreneurship]. 2015, no. 6—3 (59—3), pp. 491—496. (In Russian)
  18. Trifonov D.A. Mesto risk-menedzhmenta v obshchey strategii upravleniya bankom [Place of Risk Management in the General Strategy of Bank Management]. Vestnik Volgogradskogo gosudarstvennogo universiteta. Seriya 3: Ekonomika. Ekologiya [Science Journal of Volgograd State University. Global Economic System]. 2010, vol. 3, no. 2, pp.169—173. (In Russian)
  19. Uvarova S.S., Papel’nyuk O.V., Panenkov A.A. Kontseptual’nye i metodicheskie aspekty upravleniya innovatsionnym razvitiem stroitel’nogo predpriyatiya v proektsii teorii organizatsionno-ekonomicheskikh izmeneniy [Conceptual and Methodological Aspects of Innovative Development Management of a Construction Enterprise According to the Theory of Organizational and Economical Changes]. Ekonomika i predprinimatel’stvo [Economy and Entrepreneurship]. 2015, no. 3—2 (56—2), pp. 809—811. (In Russian)
  20. Silka D.N. Mechanisms to Actuate Growth in Conditions of Stagnation of Russian Economy. World Applied Sciences Journal. 2014, vol. 31, no. 1, pp. 148—150. DOI: http://dx.doi.org/10.5829/idosi.wasj.2014.31.01.14289.

Download

Organization and implementation of risk-management in building enterprise

Vestnik MGSU 12/2018 Volume 13
  • Barkhi Reza - Pamplin Hall, Suite 3007, Blacksburg, VA 24061, USA KPMG Professor, Dr., Professor of Pamplin college of business accounting and information systems, Pamplin Hall, Suite 3007, Blacksburg, VA 24061, USA, ; This e-mail address is being protected from spambots. You need JavaScript enabled to view it .
  • Borkovskaya Victoria G. - Moscow State University of Civil Engineering (National Research University) (MGSU) PhD in Economic Science, Associated Professor of Department Housing & Communal Service, Moscow State University of Civil Engineering (National Research University) (MGSU), 26 Yaroslavskoe shosse, Moscow, 129337, Russian Federation; This e-mail address is being protected from spambots. You need JavaScript enabled to view it .

Pages 1482-1490

Introduction. Consider the system of organization and implementation of risk management in the building enterprise. The introduction and management of risks in an industrial enterprise is an actual problem due to the occurrence of the following list of factors: incomplete information, elements of randomness, unpredictability of actions of a partner or competitor, among others. Risk management is a process that must begin at the development stage of a industrial company’s strategy, and necessarily with the participation of its owners, since it is the owners who, when developing a strategy, should determine the maximum level of total risk that the industry company will be ready to accept in the course of its activities. Risk management in industrial enterprises should be implemented within the framework of the system and process approaches, taking into account the specifics of the industry using modern effective management methods and production organizations, as well as using risk management tools. Materials and methods. The methodology of the continuous risk management process was used to study the industry organization and implementation of risk management, and systems analysis, modeling and synthesis methods were used. Results. It was determined that the creation of a risk management department is appropriate for effective risk management at the industry enterprise. The main responsibilities of this unit, including for staff and other users (including employees, consultants and contractors), in order to successfully implement the management strategy, require unconditional implementation to minimize risks and eliminate costs in implementing risk management. It was revealed that as a result of introducing risk management in industry enterprises of various industries, a set of measures should be developed to evaluate the operational risks of an enterprise, integral risk, quantitative assessment of which is based on a comprehensive analysis of financial and accounting reports, and conducting an integrated risk assessment based on all levels of responsibility within the industrial enterprise. Conclusions. Risk management at industrial enterprises should be carried out within the framework of the system and process approaches, taking into account the specifics of the industry using modern effective management methods and production industrial organizations, as well as using risk management tools.

Download

Results 1 - 2 of 2